Welcome to sadaf24.com Sign In | Join Free | Community | Inquiry Basket ( 0 ) | Help    
6thyear

Products

CONTACT US


Street Address : East industrial Zone, Anping, Hebei, China.

City : Hengshui

Country : China


Send Inquiries

   

3D panel structure and construction

3D panel structure and construction

Price:

$ 20.00


Minimum Order:
1
Relevant Images:

Posted On:
2016-12-26 19:32:05
Location:
East industrial Zone, Anping, Hebei, China.
Price:
$ 20.00
Shipping Cost:
$ 1.00
Samples Available:
no
Minimum Order:
1
Quantity:
10000
 
Posted by:
Anping No.1 Welded Mesh Panels Factory [ Gold ]
Categories: Home > Minerals & Materials > Wire mesh
Description: 3D panel structure and construction 3D Panel Wall Structure Foamed polystyrene insulating layer with the thickness of 100m/m in the center, steel wire truss coated with zinc of 3m/m (3.8mm) between the insulating layer is pinned at 2 intervals, at both sides of which forms up at 5cm × 5cm (5cm × 10cm) intervals with the wire mesh coated with zinc of 3m/m (3.8mm) that is at fine-spun 50m (100m) intervals. So the whole points of contact in all steel wires is joined in a spot welding, which is a panel of 2.4m (4m) full length, 1.2m width, 60~200m/m thickness. At the first time, it will be sprayed or hand plastered on the both sides in a thickness of 7m/m ~10m/m, and finished with first coat and double second coat of 35m/m ~ 30m/m thickness, which produces the structure with the total thickness of 12cm ~ 13cm, the self-load of 120kg/m2, and the strong earthquake proofing. Construction of 3D Panel Wall System After setting up the fixed metallic materials upon the foundation concrete, the panel is to be in- between stabilized. Tie up the connecting line of #22, every kind of strengthened mesh between concrete and panel, panel and panel. Lay under the ground the essential electrical pipes and all types of arrangements pipe. Finish with the examination to the assemblage, horizontality and verticality, reinforcement and pipe arrangement status. Finish the global body with the first time mechanism of spraying cement mortar, and with the second time hand plastering of skimming coating. It can be finalized with every type of materials in correspondence to its usage like pitching, tiling, marbling, paper hanging, painting. If used for more than second floor building, the construction procedure is like this: 1 assemble the lower part wall, 2 lay down the foundation concrete, 3 assemble the upper part wall, 4 mechanical plastering on the lower part, 5 spraying after laying down the foundation concrete on the upper part.
Send Inquires View Company Profile Add to Inquiry Basket Add to Contact List Add to Block List Add to Favorites
gitc21.net
 
Sial China
 
G-Trade
 
Europages